OEM FAQ

Frequently Asked Questions — China Vacuum OEM & Factory

Everything you need to know about vacuum OEM/ODM manufacturing, MOQs, certifications, and our process.

Ordering

Standard models require a minimum order of 200 units. Full custom projects with new tooling start at 500 units. We also accept mixed-SKU batches — contact our sales team to discuss your specific configuration.

  • ODM (existing certified platform): 200 units minimum — use our pre-certified cordless vacuum platforms with your branding
  • Full OEM (new tooling / custom design): 500 units minimum — includes new mould development, custom mechanical design, and certification testing
  • Mixed-SKU batches: Accepted — contact us to discuss split configurations across multiple models
  • Trial / market-test orders: Available on select standard platforms; contact us for current availability

Sample cost is 100% credited against your first bulk order (same model), reducing upfront investment for new OEM clients.

Compliance

All Houseclean vacuum platforms are pre-engineered for CE, RoHS, FCC, KC, and PSE compliance. We provide full third-party test reports, Declarations of Conformity, and market-specific labeling guidance. Additional certifications (GS, CCC, SAA) available upon request.

Production

Samples: 7–14 days after spec confirmation.
Mass production: 30–40 days from purchase order confirmation.

Rush production available for select standard models — contact us for availability.

OEM Process

To start a China vacuum OEM order with Houseclean Electric:

  1. Send your brief — product type, target market, annual volume estimate, and any existing reference samples or drawings
  2. Sign a mutual NDA — we provide a standard template; no technical disclosure before NDA
  3. Receive feasibility assessment — our Suzhou engineering team reviews within 48 hours
  4. Select a platform — choose from our existing certified ODM platforms (fastest to market) or proceed with new OEM tooling
  5. Confirm samples — 7–14 days for ODM, 21–35 days for new tooling
  6. Place purchase order — 30% T/T deposit, mass production begins, 30–40 day lead time

Factory & Location

Suzhou, Jiangsu Province is one of China’s most important vacuum cleaner manufacturing hubs for several reasons:

  • Complete supply chain — BLDC motor suppliers, filter manufacturers, battery specialists, and injection moulding partners all within 100 km
  • Logistics — 90 minutes to Shanghai Pudong Airport; same-day access to Port of Shanghai (world’s largest container port)
  • Skilled workforce — proximity to top engineering universities and a large pool of experienced small-appliance production workers
  • Regulatory environment — Jiangsu Province has strong IP protection laws, important for OEM clients protecting proprietary designs

Houseclean Electric’s factory is located in Xiangcheng District, Suzhou — a 30-minute drive from Suzhou North high-speed railway station.

Still have questions?

Our engineering team is happy to answer any specific questions about your project.

Sales Engineering Team

Ask Our Engineering Team

Our sales engineering team responds within 24 hours. All inquiries are NDA-protected.

  • 24-hour response guarantee
  • NDA available before any disclosure
  • Sample cost 100% credited to first order
  • Factory audit always welcome (SGS / BV)

Inquiry Sent!

Inquiry received — we'll reply within 24 hours. Check your inbox.

You've reached today's submission limit. Please reach out directly:

Chat on WhatsApp

NDA-protected · No spam

Your inquiry is processed via Formspree (secure HTTPS). See our Privacy Policy.